engine maintenance (filters and oil)
primary
mast spreader and tips replacement
secondary
install dome GPS to replace USB and ROS
secondary
depth to ITC-5 and i70s in new place
secondary
replace panel and integrate STV-208
replace reefing lines
(2026-04-11)
add mini fuse to 12V permanent DC
(2025-08-29)
wash and clean all covers
(2023-08-24)
replace water tank sensor (35mm hole)
(2023-04-06)
fix bilge pump switch with small screws
(2023-03-24)
anti osmosis protection and anti-fouling
(2023-03-07)
toilet repair
(2023-03-07)
replace main cabin portlights
(2023-03-07)
engine inspection and service
(2023-02-20)
try to get a berth/mooring in Mgarr and Bugibba
(2023-01-31)
provide Kalkara with a list of task to be done and request an updated quote
(2023-01-19)
finish name change and call surveyor for approval (if applicable)
(2023-01-16)
arrange with surveyor for moisture readings (mid December)
(2023-01-06)
wait for valuation, fix insurance 3rd party liability and check quote for comprehensive
(2022-12-07)
finish new registration with TM (check encumbrances and name availability)
(2022-11-21)
prolong stay in kalkara until end of March
(2022-11-18)